Earthworks can be costly, management of import/export material can save vast amounts of money.

Carrying out volume calcs when raising or lowering finish levels is always money well spent.

Forecasting import and export of materials saves unexpected costs. Using site investigation reports intelligence project management analyse this data and create multiple surfaces, which can be used to create a digital terrain model which can be used to take away target strata’s such as topsoil, or site won materials for reuse later in the project.

Knowing the depth at which the material finishes minimize mixing therefore more material can be reused. As a consequence, volumes can be calculated from these surfaces ensuring the site team can find a place to store the material until it is ready to be used, or if required a haul route and storage area can be specified by intelligence project management.